Space not available
Reserve this advertising space
Selected ad format
The file format is not recognized
Click here for
upload an ad
Click here to download
an announcement
Here drag and drop or
upload an ad
Send the ad up to 8 days after payment
A link will be sent to you by contact@via-agency.media
Reserved space
Announcement transmitted
Reference
– The construction of the Mangoky Bridge
The project to build the 880-meter bridge over the Mangoky River is part of the RN9 road construction project. Work will begin in June 2021.
Space not available
Reserve this advertising space
Selected ad format
The file format is not recognized
Click here for
upload an ad
Click here to download
an announcement
Here drag and drop or
upload an ad
Send the ad up to 8 days after payment
A link will be sent to you by contact@via-agency.media
Reserved space
Announcement transmitted
Reference
Linking the Atsimo Andrefana and Menabe regions (South-West), it is part of the Government's strategy aimed at opening up large residential areas and major positive impacts on the development of agriculture, tourism, the economy in general and more specifically the fight against food insecurity in rural areas directly influenced by this infrastructure. The main objectives of the project are:
– the promotion of trade between the Southwest and the rest of the country;
– the contribution to the economic and social development of the project area;
– improving the living environment and reducing poverty among the populations in the project area;
Space not available
Reserve this advertising space
Selected ad format
The file format is not recognized
Click here for
upload an ad
Click here to download
an announcement
Here drag and drop or
upload an ad
Send the ad up to 8 days after payment
A link will be sent to you by contact@via-agency.media
Reserved space
Announcement transmitted
Reference
– improving service conditions in the South-West region of Madagascar, reducing transport time and costs;
– the development of the region’s tourist and agricultural potential;
– facilitating basic access and combating poverty.
The project cost is USD 64.28 million, with the following funding: BADEA: USD 20.00 million (31.11%); FSD: USD 20.00 million (31.11%); OFID: USD 10.00 million (15.55%); FKDEA: USD 10.00 million (15.55%); Government: USD 4.28 million (6.67%).
Space not available
Reserve this advertising space
Selected ad format
The file format is not recognized
Click here for
upload an ad
Click here to download
an announcement
Here drag and drop or
upload an ad
Send the ad up to 8 days after payment
A link will be sent to you by contact@via-agency.media
Reserved space
Announcement transmitted
Reference